Large-Format Bedplates for Turbogenerator Sets

We manufactured large, heavy-section bedplates and frames to support turbo-alternator equipment for the energy sector.

Large-format turbogenerator bedplate, painted grey, in the manufacturing plant

Project Data

In this project, the frame also incorporated a sealed oil tank, verified by pressure leak tests.

Client
Confidential
End user
Siemens Energy
Sector
Energy
Year
2021-2026
Market where it was implemented
European Union
What was manufactured
15 bedplates for turbogenerator sets
Weight
Between 16 and 24 tonnes per unit
Dimensions
Up to 12,000 × 4,000 × 1,000 mm; also units of 10,500 × 3,600 × 600 mm
Project type
Manufacture and painting
Services provided
Boilermaking, welding, machining, coatings and testing

Large, Strong Bedplates

The customer needed large, heavy-section bedplates capable of supporting its turbo-alternator equipment, for which it needed to hire a manufacturer with experience and technical knowledge of this type of structure, such as EPER Group.

Unpainted bedplate frame in the outdoor yard, resting on trestlesOverhead view of the bedplate frame with its reinforcements and the oil tank recess

Strict Geometric Control

The main challenge was to control the distortion inherent in welding a large-format, heavy-section structure, while also maintaining the tight geometric tolerances required for mounting the frame for the turbogenerator and, at the same time, ensuring the tightness of the oil tank integrated into the bedplate.

Precise Manufacturing and Testing

We approached the manufacture of the bedplates with a combination of heavy boilermaking, welding, machining, coatings and testing, paying particular attention to the geometric control of a large-format, heavy-section structure.

The integrated oil tank was also validated through pressure leak tests, to ensure that the assembly met both the structural and the functional requirements of the equipment.

Welder working on the bedplate frame inside the plant, surrounded by welding curtainsOverhead view of the welding of the bedplate frame in the plant

A Recurring Project

The work was carried out as a recurring manufacturing project, active since 2021. Our work focused on the manufacture, testing and painting of the bedplates.

Thanks to the expertise of the EPER Group team, the specific requirements of the end customer were met, with rigorous manufacturing standards and testing to ensure the bedplates performed as required.

15 Bedplates with Sealed Oil Tanks

The final result was the manufacture and ongoing delivery of large-format bedplates for turbogenerator sets, weighing between 16 and 24 tonnes and built to demanding tolerances, which also incorporate a sealed oil tank validated by pressure tests.

Since 2021, we have delivered 15 units: an established solution for the ongoing manufacture of this type of industrial equipment.

Key Metrics

Key project data.

  • 15 units

    delivered with their final finish

  • Between 16 and 24 t

    in weight

  • Up to 12 m

    long