- Home
- Case Studies
- Wind
- Lifting tooling for a wind tower factory
Case study · Wind
Lifting Equipment for a Wind Tower Factory
We designed and manufactured a complete range of custom lifting equipment for Baltic Towers' new plant in Poland.

Project Data
We manufactured spreaders, C-hooks and J-hooks with capacities of up to 250 tonnes.
- Client
- Baltic Towers
- End user
- Baltic Towers
- Sector
- Wind
- Year
- 2025
- Market where it was implemented
- Poland
- What was manufactured
- Spreaders, C-hooks and J-hooks
- Lifting capacity
- 50, 125, 180 and 250 t, depending on the equipment
- Materials
- S355 steel and PEHD-500 engineering plastic
- Certifications and standards
- UNE-EN 13155
- Services provided
- Engineering, manufacturing, testing, transport and on-site technical support
- Project type
- Design, manufacture and supply of a range of custom tooling
- Validation
- SAT tests using the bulkiest tower section available at the factory
The Customer's Need
Versatile, Custom-Built Lifting Equipment
The customer needed to modernise the lifting systems of its new factory for the different stages of the offshore wind tower manufacturing process.
Until then, handling operations were carried out with slings, so the company needed more suitable and versatile equipment to handle different tower sections and variants, adapted to its new facilities. Handling such bulky components could create a bottleneck and, as a result, a loss of profitability in operations.


The Challenge
Precision and Speed of Response
We faced a project in which precision was essential. The main challenge was to adapt the tooling to the new facilities and to the specific handling operations of each manufacturing stage.
In addition, the lifting equipment had to be versatile enough to accommodate as many tower variants as possible (50, 125, 180 and 250 t). All of this had to be resolved within a tight implementation timeframe.
The Solution
Coordination with the Customer
The solution was to define, together with the customer, the specific needs of the new factory and the handling operations of each stage of the process.
Based on that analysis, our team developed 3D models and performed structural calculations and designed spreaders, C-hooks and J-hooks adapted to different configurations, with lifting capacities of up to 250 tonnes to maximise the versatility of the equipment.


The Work Carried Out
Design, Manufacturing, Support and Verification
The work began with the joint definition of the new factory’s needs. From there, at EPER Group we reviewed the different tower references, developed the 3D models and structural calculations and designed a range of spreaders, C-hooks and J-hooks adapted to different loads and configurations.
The manufacture and testing of the tooling followed, then transport of the tooling and commissioning at the customer’s facilities. We also provided support during the site acceptance tests (SAT), in which the equipment’s operation was verified using the bulkiest tower section available at the factory. Delivery was completed in the summer of 2025.
The Result
A Versatile Range of Tooling
The project ended with the delivery of the lifting tooling: spreaders, C-hooks and J-hooks with capacities of between 50 and 250 tonnes. The variety of equipment made it possible to cover different tower references and different stages of the manufacturing process.
Compared with the previous use of slings, our equipment has helped define a better-aligned, more productive production process with less downtime.
Key Metrics
Key project data.
250 t
maximum load
S355 steel
to ensure strength and rigidity
UNE-EN 13155
reference standard for the safety of non-fixed load-lifting attachments
Gallery
Here is the manufacturing process behind this range of lifting tooling for wind tower manufacturing.